Brushed nickel concealed shower faucet for the shower, stainless steel body, round rain head and handheld wand — SANIKB FYF-9012-1.Matte black concealed shower faucet for the shower, stainless steel body, round rain head with slim hand spray — SANIKB FYF-9012-1.Gunmetal grey concealed shower faucet for the shower, stainless steel body, round rain head and slim handheld — SANIKB FYF-9012-1.Brushed gold concealed shower faucet for the shower, stainless steel body, round rain head and twin-lever mixer — SANIKB FYF-9012-1.Dimensioned spec drawing for SANIKB FYF-9012-1 concealed shower faucet: 200mm arm, Ø200 rain head, Ø180 mixer plate, 190mm handheld.
01 / 05

Round Rain Shower Faucet with Handheld & Diverter Valve – FYF-9012-1

SKU FYF-9012-1NP
Finish
Certification
cUPC
Min. order
100 pcs
Lead time
30–45 days
Reply time
12h
Type Concealed shower set
Size Ø7.9" rain head × 7.9" arm (Ø200 × 200 mm) Custom sizes
Mount Wall-mounted (concealed valve)

For distributors, private-label programs and project sourcing, FYF-9012-1 keeps the overhead rain shower and handheld functions in a straightforward two-outlet concealed layout. This round rain shower faucet with handheld and diverter valve is intended for buyers who need a compact wall-mounted configuration without adding a tub spout or additional body-spray outlets.

Configurations

4 factory configurations of FYF-9012-1

Every option below is a produced configuration with its own SKU. 4 finishs . Name the exact SKU on each purchase order line.

Brushed nickel concealed shower faucet for the shower, stainless steel body, round rain head and handheld wand — SANIKB FYF-9012-1.
FYF-9012-1NP
Brushed Nickel
Matte black concealed shower faucet for the shower, stainless steel body, round rain head with slim hand spray — SANIKB FYF-9012-1.
FYF-9012-1BK
Matte Black
Brushed gold concealed shower faucet for the shower, stainless steel body, round rain head and twin-lever mixer — SANIKB FYF-9012-1.
FYF-9012-1LA
Brushed Gold
Gunmetal grey concealed shower faucet for the shower, stainless steel body, round rain head and slim handheld — SANIKB FYF-9012-1.
FYF-9012-1LH
Gun Metal Grey

Mixed-configuration orders are accepted within one purchase order. Confirm the SKU, finish and size on the quotation before sample approval. Request the full configuration list.

Send a spec. Get a real quote in 12h.

Engineer-reviewed. cUPC · CE · ISO 9001 ready. 30–45 day lead time, FOB or CIF.

One itemised quote — not five
Feasibility & certification checked per market
Have a spec file? Email it with your reference number
— Project brief B2B only
Enquiry about Round Rain Shower Faucet with Handheld & Diverter Valve – FYF-9012-1 SKU FYF-9012-1NP
Please enter your first name.
Please enter your company name.
Please enter a valid email.
Please select your role.
Please select a quantity.
Please select your target market.
Engineer reply within 24 working hours

12 consecutive years at KBIS and IBS.

— Most recent
Feb 2026 KBIS· Orlando, USA
Mar 2026 Expo Revestir· São Paulo, Brazil
16 years on the floor · 6 international shows annually
2026 Expo Revestir

2026Expo Revestir

São Paulo, Brazil
2026 KBIS

2026KBIS

Orlando, Florida
2025 KBIS

2025KBIS

Las Vegas, USA
2025 The Big 5

2025The Big 5

Dubai, UAE
2024 IBS

2024IBS

Orlando, USA
2024 Expo Guadalajara

2024Expo Guadalajara

Guadalajara, Mexico
2023 Canton Fair

2023Canton Fair

Guangzhou, China
2019 Cersaie

2019Cersaie

Bologna, Italy
2018 ISH

2018ISH

Frankfurt, Germany
2017 The Big 5

2017The Big 5

Dubai, UAE
2014 KBIS

2014KBIS

Las Vegas — US debut
2012 BAU

2012BAU

Munich, Germany

Standard on every shipment.

IAPMO cUPC certificate
ISO 9001 quality management certificate
WRAS approved product certificate
IAPMO certificate of listing
UDEM CE technical inspection certificate
FUNCTION PLANNING

Confirm the Two-Outlet Control Logic Before Approval

For project specifications, confirm how the diverter is expected to route water between the overhead outlet and handheld outlet before approving the fixture schedule.

If a project requires a particular switching sequence, simultaneous outlet operation or another control arrangement, include that requirement with the technical inquiry rather than assuming it from the exterior trim.

CHECK BEFORE SPECIFICATION

Required outlet switching sequence

Whether simultaneous outlet operation is required

Any project-specific control requirement

ROUGH-IN COORDINATION

Resolve In-Wall Requirements Before Wall Closure

Concealed plumbing leaves less room for correction after the finished surface is installed. The project team should therefore confirm the in-wall requirements against the approved technical submittal before closing the wall.

01
Valve depth

Confirm the required installation depth against the finished-wall build-up.

02
Connection sizes

Check inlet and outlet requirements against the project plumbing specification.

03
Outlet coordinates

Coordinate plumbing locations before tile, stone or wall panels are completed.

04
Water requirements

Confirm the project's required pressure and flow conditions before approval.

05
Service access

Review how serviceable components will be accessed after installation.

If a contractor, builder or plumbing consultant has already issued a rough-in drawing or fixture specification, attach it to the inquiry so the required configuration can be reviewed before ordering.

PHASED & REPEAT ORDERS

Keep Repeat Orders Tied to the Approved Reference

For phased projects and distributor replenishment, purchase documents should reference the same approved variant information used for the original order.

This creates a clearer record when later batches need to be checked against earlier approvals, particularly for hospitality, multifamily and private-label programs.

01
Approved variant

Keep the agreed commercial reference on purchase documents.

02
Variant SKU

Use the applicable SKU when a program includes multiple versions.

03
Approval sample

Retain the approved sample or documented reference for comparison.

04
Revision record

Identify specification changes before subsequent production runs.

PROJECT SUBMITTALS

Request Documentation for the Exact Model Being Ordered

Project buyers should match technical and compliance documents to the exact model or variant included in the purchase order. Do not rely on a general product-family logo when a project requires model-specific verification.

Where North American plumbing certification is part of the specification, current listings can be independently checked through the official IAPMO Product Listing Directory.

Verify listings in the IAPMO directory
Technical submittal

Use the current model-specific drawing and specification.

Installation information

Confirm the instructions required by the installer or project team.

Compliance records

Request current records when certification is specified by the project.

Packaging references

Include labeling or project-marking requirements where applicable.

B2B SOURCING

Define OEM and Private-Label Scope Before Quotation

SANIKB coordinates faucet programs through its vetted sourcing network. For OEM, private-label or project inquiries, submit the required scope first so the applicable options can be reviewed for this model.

This avoids treating every catalog configuration as automatically available with every customization.

Review SANIKB OEM / ODM services
Branding

Submit logo and model-label requirements for feasibility review.

Packaging

Define carton, labeling and private-label presentation requirements.

Documentation

Identify manuals, labels or project documents required for the market.

Sample Requirements

Specify what needs to be reviewed before bulk-order planning.

REQUEST FOR QUOTATION

What to Include in an FYF-9012-1 RFQ

The most useful RFQ is one that identifies the required commercial and technical scope upfront. If you already have project drawings or a fixture schedule, attach them with the inquiry.

01

Required variant and quantity

02

Destination market

03

Required certification or project documentation

04

Distribution, private-label or project application

05

Branding and packaging scope

06

Technical requirements or drawings to be matched

07

Sample and target delivery requirements

Providing the project scope with the first inquiry helps reduce specification back-and-forth before quotation.

Request FYF-9012-1 Pricing

How we work

From enquiry to shipment

A factory-direct process built for importers, distributors and project buyers. No trading layer in between.

  1. 01

    Send the enquiry

    Tell us the model, quantity, destination market and any branding or packaging requirement. A spec sheet or drawing helps but is not required to start.

    Replied within 12 hours
  2. 02

    Our sales team contacts you

    A named account manager follows up by email or WhatsApp, confirms the specification and clarifies anything missing before pricing.

    Email or WhatsApp
  3. 03

    Quotation

    You receive a written quotation with unit price, MOQ, packing details, lead time and the trade term you asked for. Entry, mid and premium build levels can be quoted side by side.

    FOB or CIF
  4. 04

    Sample approval

    We send a sample for finish, function and packaging sign-off. Branded samples are produced once artwork is confirmed.

    Before mass production
  5. 05

    Production and shipment

    Mass production starts after sample approval and deposit. QC and inspection run before loading, then the order ships to the agreed port.

    30–45 days after approval
50+ New models developed every year, tracking current North American and European trends
12h Maximum first response to an enquiry
Since 2000 Foshan factory, B2B trade only

OEM and ODM to your specification

We develop to a brief. Send a reference model, a drawing or simply the price band and market you are targeting, and we will propose what fits. Entry, mid and premium builds are all available from the same factory.

  • Your logo on product, carton and documentation
  • Private-label packaging and manuals
  • Custom finish matched to your standard
  • Custom dimensions and tooling where volume supports it
  • Product development from your reference or price target
  • Destination-market documentation prepared on request

FAQs

How does the diverter work on FYF-9012-1?

The concealed diverter routes water between the fixed rain shower head and the handheld shower. If a project requires a specific outlet sequence or simultaneous operation, confirm that requirement before ordering.

What should contractors confirm before installing the concealed valve?

Confirm the valve depth, connection sizes, wall build-up, outlet positions and project water requirements against the approved technical drawing before closing the wall.

What certification information should U.S. buyers request?

Ask for current documentation covering the exact model or SKU being ordered. Where cUPC compliance is required, the listing should be checked against the applicable certification documents and, when available, the IAPMO Product Listing Directory.

Can FYF-9012-1 be considered for private-label or project orders?

Yes. Private-label, packaging, finish and project requirements can be submitted for review through SANIKB's OEM/ODM program. Include the required quantity, market and customization scope so feasibility can be confirmed with the quotation.