

Commercial Chrome Robe Hook

More in Slim Chrome Bathroom Hardware Set
Mix any models in one 20ft container · no per-model minimum
Styles & finishes
7 finishes available on 827008
Every finish on the same body · 7
- Chrome
- Polished Chrome
- Brushed Nickel
- Polished Gold
- Brushed Gold
- Gun Grey
- Antique Bronze
Name the finish on every line of the purchase order rather than once at the top. Ask for the finish sample card.
Slim Chrome
Every piece below is the same design in the same finish — specified and quoted as one set.





Send a spec. Get a real quote in 12 business hours.
Engineer-reviewed. cUPC · CE · ISO 9001 ready. 30–45 day lead time, FOB or CIF.
12 consecutive years at KBIS and IBS.
Factory documentation
Certification scope depends on the selected model and destination market. Request model-specific documents with your quotation.
Point Load
The 827008 hook takes a wet robe at one point on the wall
Nothing spreads the load on a hook. A wet robe hangs its full weight at one fixing position, and that is the whole question on this piece.
One point carries everything
Ask for the fixing detail and the plate footprint before the wall build up is decided. A hook has no second bearing point.
Slim 827 profile, single hook
Wall mounted, SUS304 stainless steel, seven finishes, one of five models in the slim set. Projection is unpublished, so take it from the drawing.
The other four slim models, including the 827001 towel bar, are in the 827 hardware series.
Fit & Mounting
The hook decision is height, then anchor
Hook height is a room decision and the record does not make it. Projection and fixing detail are not published.
- Model
- 827008
- Type
- Robe Hook
- Mounting
- Wall Mounted
- Finishes
- 7
Hook height follows the garment, not the tile course. Set it on the drawing with the door swing already in place.
Never set a hook out from a photograph. Use the drawing.
Material & Finish
Chrome as listed, six further finishes on request
SUS304 stainless steel is what the record names. Plate footprint is not published, so ask for the drawing.

Chrome, Polished Chrome, Brushed Nickel, Polished Gold, Brushed Gold, Gun Grey, Antique Bronze
One hook, seven finish routes
Chrome, Polished Chrome, Brushed Nickel, Polished Gold, Brushed Gold, Gun Grey and Antique Bronze.
A hook is the smallest piece to sample, so it is the quickest way to get a finish in front of a client. Colour is fixed at order stage and mixed finishes share one order when each line names its own.
Sample in the exact finish before a project standard is fixed.
Compliance
Documentation held against 827008
Asked early, the document list is answered with the quotation.
827008 is cUPC listed. Material, finish, mounting and type make up the rest of the record, and that is what a client is shown.
Name the market and building type at RFQ and the handover paperwork is prepared with the order.
Procurement
A five model slim set on one purchase order
Fifty pieces is the published minimum. Hooks are usually the highest count line in a hardware order.
- Published MOQ
- 50 pcs
- Lead Time
- 30-45 days after sample approval
- Set
- 827 series, 5 models
The slim line is 827001 towel bar, 827007 pivoting toilet paper holder, 827009 towel ring and 827010 soap dish holder, quoted as one set document.
The spec sheet comes with the quotation, answered within 12 business hours. OEM and ODM covers private label, logo, custom finish and custom packaging. See the OEM and ODM program.
Include these details with the RFQ
- Hooks per room and total
- Finish name on every line
- Wall build up at the fixings
- Destination country and window
Mixed finishes and mixed models run on one order.
How we work
From enquiry to shipment
A factory-direct process built for importers, distributors and project buyers. No trading layer in between.
-
01
Send the enquiry
Tell us the model, quantity, destination market and any branding or packaging requirement. A spec sheet or drawing helps but is not required to start.
-
02
Our sales team contacts you
A named account manager follows up by email or WhatsApp, confirms the specification and clarifies anything missing before pricing.
-
03
Quotation
You receive a written quotation with unit price, MOQ, packing details, lead time and the trade term you asked for. Entry, mid and premium build levels can be quoted side by side.
-
04
Sample approval
We send a sample for finish, function and packaging sign-off. Branded samples are produced once artwork is confirmed.
-
05
Production and shipment
Mass production starts after sample approval and deposit. QC and inspection run before loading, then the order ships to the agreed port.
OEM and ODM to your specification
We develop to a brief. Send a reference model, a drawing or simply the price band and market you are targeting, and we will propose what fits. Entry, mid and premium builds are all available from the same factory.
- Your logo on product, carton and documentation
- Private-label packaging and manuals
- Custom finish matched to your standard
- Custom dimensions and tooling where volume supports it
- Product development from your reference or price target
- Destination-market documentation prepared on request



